ABOUT THE ASSOCIATION
General Information
Membership Benefits
How To Join
Officers and Chairs
Awards
Contact the Association

PUBLIC EDUCATION
Legislative Initiatives
Biosolids Education
Water Sourcebook
Links to Related Sites

MEMBER INFORMATION
Member Discussion List

Calendar of Events
Committees
Job Postings
IWPCA Library
5-S Members

Technology Transfer 
Increasing Your Existing Sewer System Capacity

KWEA Collection System Committee 
First in a 2-Part Series 

Thad May. P.E.
George Butler Associates
    

Installing a renewal liner in an existing sewer typically improves the flow characteristics by smoothing over structural defects, eliminating root growth, and reducing the friction coefficient, or Manning's "n" value. A best-case scenario design would improve the n value from 0.014 (typical for deteriorated VCP sewer) to 0.009 (typical for a new PVC or HDPE liner). This results in a 55% increase in flow capacity. However, this optimistic claim does not take into account liner thickness, liner pipe diameter, and the condition of the host pipe. The liner thickness requirements will vary with material used, renewal method, host pipe condition, severity of offset joints, soil depths, soil type, live load, and hydrostatic load. There are three (3) basic methods for trenchless renewal of deteriorated clay or concrete pipe: 1) Cured-in-place pipe (CIPP) liner, 2) Deform & reform, and 3) Slip line.

For circular pipes flowing full, Manning's equation can be simplified to compare the before and after pipe capacity as a % of existing capacity, as follows:

% Existing Flow Capacity = (n existing/ n new) x (Dia new / Dia existing)8/3 x 100

For the example appearing in the table below, an "n" value of 0.010 has been used as a more realistic value for long-term design conditions. The liner thickness is based on typical values for pipe at 15 ft. pipe depth and a partially deteriorated host pipe. Applying these values to the table below gives an increase in pipe capacity ranging from -17% to +23%.

Typical Sewer Capacity Increase by Various Lining Methods

Rehabilitation Method Host Pipe Inside Dia. Host Pipe "n" Liner Pipe Outside Dia. Liner Thickness Renewal pipe "n" % Capacity Increase (in) (in) (%) CIPP 8.00 0.014 8.000 0.236 0.010 19% Deform & Reform 8.00 0.014 8.000 0.195 0.010 23% Slipline 8.00 0.014 7.125 0.274 0.010 -17%

In the second article, we will compare partially deteriorated and fully deteriorated liner design and it's impact on liner thickness and Manning's "n" for each rehabilitation method.
    

Submitted by
J. Thad May, P.E.
Project Engineer
George Butler Associates
9801 Renner Boulevard
Lenexa, Kansas 66219-9745
913-577-8249 (Direct)
913-577-8346 (Fax) 
tmay@gbutler.com

www.gbutler.com


 Please report any problems with this site to webmaster@iawpca.org

Iowa Water Pollution Control Association
707 Diamond Court
Ames, Iowa 50010-8407
(800) 469-2426 (Iowa Only) ~ (515) 232-4952 (Outside Iowa)
clenh2o@aol.com

©  1999-2008 Iowa Water Pollution Control Association